User name Aniol
Log entry time 08:03:07 on December 8,2008
Entry number 252514
keyword=shift summary
00:00 no beam at start of run, injector problem
gas alarm, see entry 252476, 252477, 252485
run 4285, 4286 taken with low/poor gas flow, rich and vdcs show loss of efficiency
03:07 start run (30529, 4288), 3He production
03:33 end run 4288, q = 0.009C, beam off for 12 minutes
03:37 start run 4289, q = 0.0392
04:41 start run 4290
05:42 end run 4290, q = 0.0393C
move target to empty to allow MCC time to tune
6:06 MCC done with tuning, move 3He tgt back into beam position
6:07 start run (30530, 4291)
07:12 end run 4291, q = 0.0391C
total charge 4288->4291 = 0.1266C
total good charge 4226->4291 = 2.06C
07:13 start run 4292