    keyword=Moller result

    Moller results on Dec 09 18:00-20:00


    Preliminary results: not corrected for variations along the targets
     #     beam     runs target Ptarget% Pbeam%
    1 0.48 µA 13015-13018 5 7.97 79.8±0.2±2.0
    2 0.48 µA 13019-13022 4 7.44 79.9±0.3±2.0
    3 0.48 µA 13023-13026 3 7.62 76.6±0.3±2.0
    4 0.48 µA 13027-13030 2 8.21 79.3±0.2±2.0
    5 0.78 µA 13031-13034 5 7.97 79.1±0.3±2.0
    average 1,2,4 79.7±0.2±2.0

    The target 3 is excluded from the average. This target was installed for test purposes as one with large variations of the magnetic flux along its length.