User name D. Parno
Log entry time 00:05:51 on December11,2008
Entry number 252910
keyword=Swing shift summary
Shift workers:
Huan Yao (TO)
Diana Parno (3rd)
Shift begins in production running. Big Bite high voltage had recently tripped without an alarm.
Production runs*:
4377: continued from previous shift. 0.03978 C
4378: 0.03973 C
HAPPEX run 30548 started.
4379: 0.03995 C
4380: 0.01859 C. Stopped early due to BB HV trip (w/ alarm).
4381: 0.03971 C
4382: 0.001507 C. Stopped for beam tune that did not happen.
4383: 0.03947 C.
4384: 0.03945 C.
4385 begun; will finish on next shift.
Total beam charge this shift: 0.258187 C.
*Target temperature was oscillating throughout shift.
** Compton rates went up dramatically partway through the shift, although the beam position remained the same. Asymmetry was reduced, although this may be due to the worsening of the statistics.