Shift crew: F. Benmokhtar, X. Zhan, G. Jin.
-----------
4:00pm No beam,
MCC found what is the problem in the in-line dump.
but doesn't know how long it is going to take them
to fix it.
6:00pm Beam migh come back in 2h. the in-line dump problem is fixed.
7:30pm Move target to Beo, MCC is going to tune the beam.
9:05pm Tuned beam to the hall.
9:20pm BPM, BCM check, spot++ check. rates at 3x4 and 5x6.6 are
the same!
9:30pm We are in production mode!
---------------
Happex run: 30582
30583
-----------
Production runs:
----------------
Run# Charge (C)
4545 0.04034
4546 0.040
4547 Goes to next run.