    User name Fatiha

    Log entry time 00:01:11 on December17,2008

    Entry number 253680

    keyword=Swing Shift Summary

    Shift crew: F. Benmokhtar, X. Zhan, G. Jin.
    -----------



    4:00pm No beam,
    MCC found what is the problem in the in-line dump.
    but doesn't know how long it is going to take them
    to fix it.

    6:00pm Beam migh come back in 2h. the in-line dump problem is fixed.

    7:30pm Move target to Beo, MCC is going to tune the beam.

    9:05pm Tuned beam to the hall.

    9:20pm BPM, BCM check, spot++ check. rates at 3x4 and 5x6.6 are
    the same!
    9:30pm We are in production mode!


    ---------------
    Happex run: 30582
    30583

    -----------

    Production runs:
    ----------------

    Run# Charge (C)

    4545 0.04034
    4546 0.040
    4547 Goes to next run.