• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name E.Chudakov

    Log entry time 12:18:52 on December 17, 2008

    Entry number 253732

    keyword=Moller results

    Moller results on Dec 09 18:00-20:00

    Tuning took 1h 45m. About 1h was taken first, but then it turned out that the MCC loaded wrong values to the quads - actually the values for the regular running. It took another 45m to retune.


    Preliminary results: not corrected for variations along the targets
     #     beam     runs target Ptarget% Pbeam%
    1 0.45 µA 13039-13042 5 7.97 -80.2±0.4±2.0
    2 0.45 µA 13043-13046 4 7.44 -80.0±0.4±2.0
    3 0.45 µA 13047-13050 3 7.62 -77.8±0.3±2.0
    4 0.45 µA 13051-13052 2 8.21 -80.3±0.2±2.0
    average 1,2,4 -80.2±0.2±2.0






    Figure 1