• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Higinbotham

    Log entry time 16:22:13 on December17,2008

    Entry number 253756

    keyword=Shift Summary

    First half of shift spent on Moller Measurement.
    Eugine found 80% beam polarization.

    We then took the Half Wave-Plate Out and resumed production running.

    Run Number Events Notes
    4556 1M Normal
    4557 1M Normal

    Two run with Chernekov on (1 uA and 6 uA)

    4458 0.2M 1uA
    4459 0.37M 6uA
    4460 0.02M 12uA (accelerator problem & Cherenkov on)

    Back to production at 12uA

    4461