    Shift crew: F. Benmokhtar, M. Osipenko
    -----------

    8:05 Increase current to 13.5 uA
    8:10 Increse current to 15 uA
    8:25 back to 13.5 uA, since roc9 didn't handle the rate
    Production running at 13.5 uA,
    ps1= 2000, ps3=67, ps6=100 and ps8=100

    3:35 MCC took beam for dipole problems.
    3:50 Beam back, back to production.


    Run list:
    --------

    4626 ... test at 13.5 uA
    4627 ... test at 15.0 uA

    Production runs:
    ----------------
    run# Charge

    4628 ... 0.02446
    4629 ... 0.04192
    4630 ... 0.04211
    4631 ... 0.04167
    4632 ... 0.04135
    4633 ... 0.04204
    4634 ... 0.04218
    4635 ... 0.04208
    4636 ... 0.02233
    4637 ... goes to next shift

    Total charge during this shift: 0.34014C