User name V. Sulkosky
Log entry time 08:33:09 on December 21, 2008
Entry number 254256
This entry is a followup to: 254191
Followups:
keyword=Experiment Summary for Dec 20, Owl - Dec 20, Swing
Summary for Dec 20 (owl - swing)
Smooth data taking.
Beam in Use
shift |
ABU |
BANU |
BNA |
2008/12/19 owl | 6.94 |
0.24 | 0.81 |
2008/12/19 day | 6.99 |
0.13 | 0.87 |
2008/12/19 swing | 5.97 |
0.46 | 1.57 |
total | 19.9 |
0.8 | 3.3 |
Main events/issues:
- 08:05-08:25 Increased beam current to 13.5 uA.
- 16:56-17:58 MCC magnet problems.
- Production of pi+ on Vertical pumping at 13.5 uA.
Plans for the next few days:
- Production
- Accelerator Shut Down: Monday at 8 am
- Beam studies: Monday 8-10 am
- Target polarimetry tests
- BigBite Shower calibrations