• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Fatiha

    Log entry time 16:03:13 on December21,2008

    Entry number 254298

    keyword=Shift Summary

    Shift crew: F. Benmokhtar, M. Osipenko and P. Bradshaw
    -----------

    - 8:00... Started shift without beam.

    - 8:15... MCC says the technicien is on his way,
    No time estimate.

    - 8:25... Problem solved, MCC is asking if we want
    the beam. We of course accpeted. No time
    to page Ramesh, we are following the beam
    recovery procedure: from empty target to
    target to Beo, run with 2 uA. chek bpms, etc...

    - 8:40 MCC took beam, one of their magnet tripped.

    - 9:05 Back to production running.

    - So many beam trips: 19 trips in one hour.

    - HAPPEX DAQ crashed twice during the shift: roc26,
    then roc23 faults.

    - 3:50 MCC called, they think that the trips are half of the time
    do at the level of the ep ion chamber. They moved it upstream with 0.5mm, and will see if this helps. The bmp A and B positions didn't change and will not change during this process.

    - 4:55 Beam is stable for the last 20 minutes, MCC called, everyone
    in Happy! But no one knows how it is fixed.

    Run list:
    ---------

    4656... BeO target, bpm positons and spot++ check.

    Prodution on 3He target:
    ------------------------
    HAPPEX run:

    Run Charge

    4658 ... 0.04209
    4659 ... 0.03113
    4660 ... 0.04204
    4661 ... 0.04185
    4662 ... 0.04199
    4663 ... 0.04164
    4664 ... Goes to next shift

    Total... 0.24074 C