1600 | 1700 | 1800 | 1900 | 2000 | 2100 | 2200 | 2300 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 0.00 | 0.05 | 0.40 | 0.21 | 0.01 | 0.36 | 0.15 | 0.18 | 1.36 |
Beam Available but Not in Use | 0.41 | 0.69 | 0.57 | 0.55 | 0.83 | 0.46 | 0.42 | 0.31 | 4.25 |
Beam Not Available or Unacceptable | 0.59 | 0.27 | 0.04 | 0.23 | 0.17 | 0.18 | 0.43 | 0.50 | 2.41 |
Accelerator Con- figuration Change | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Experiment Ready | 0.00 | 0.00 | 0.40 | 0.45 | 0.00 | 0.55 | 0.58 | 0.67 | 2.65 |
Planned Config- uration Change | 1.00 | 1.00 | 0.60 | 0.55 | 0.00 | 0.45 | 0.42 | 0.33 | 4.35 |
Unplanned Experiment Down | 0.00 | 0.00 | 0.00 | 0.00 | 1.00 | 0.00 | 0.00 | 0.00 | 1.00 |
Hall not ready reasons | |||||||||
Target | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Data Acq | 0.00 | 0.00 | 0.00 | 0.00 | 1.00 | 0.00 | 0.00 | 0.00 | 1.00 |
Other | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
HRSL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
HRSR | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
HALL_OFF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Bbite | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Comments: A controlled access was made between ~20:00 and 21:00, see HALOG for details. Most of the BANU time between 21:00 and midnight was spent slowly increasing the beam current to determine the maximum operating current and prescale factors for production data taking
Data Entry by: A. Puckett