• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name C. Dutta/V. Sulkosky

    Log entry time 20:30:21 on January 16, 2009

    Entry number 256391

    This entry is a followup to: 256353

    keyword=Checked Left Gas Cerenkov Pedestals

    Run 5219 was taken with the T8 pulser to check the left HRS pedestals.
    Except for channels 5, 6 and 7, which changed by 8-11 channels, the other
    channels are within a few channels of the old pedestal values in the
    database. The width of the pedestals were between 5-7 channels and were good Gaussian shapes.
    ADC Channel    DB Ped    Old Ped     Ped (5219)
    ================================================
    0              325         335         322
    1              384.5       396         384
    2              324         332         322.2
    3              302         314         301.4
    4              424         432         420
    5              442         449         434.4
    6              498         506         487
    7              474         483         462.5
    8              372         380         370
    9              327         339         326
    
    1) "DB Ped" is the pedestal value in the analyzer database for the gas cerenkov.
    2) "Old Ped" is the pedestal value + 10 channels in the pedestal suppression file for ROC 3. 3) Ped (5219) shows the pedestal from run 5219.

    A copy of this log entry has been emailed to: ycwang,chiran,jiang,rsubedi