    User name R. Subedi

    Log entry time 13:44:12 on January18,2009

    Entry number 256684

    keyword=Run plan for today

    The hall is till in controlled access and is locked for laser work. As soon as we go to beam permit, the following things need to be done in sequence:
    1. Ask MCC to tune the beam for Compton quality until Alexander is satisfied.
    2. Check spot size/location using optics target (includes BeO).
    3. Take an hour and half H2 data (this is reference cell run) @14.0 uA
    4. Next is all production on 3He.