    User name R. Subedi

    Log entry time 08:23:31 on January19,2009

    Entry number 256790

    keyword=Run Coordinator Report: Jan 18, 2009


    Run Coordinator Report for Jan 18, 2009:
    # Polarity status of the spectrometers: BigBite -ve (for e-), L-HRS +ve (for &pi+)
    # &pi+Transverse mode before 10:00 with the half-wave-plate IN
    # &pi+Vertical mode after 14:00 with the half-wave-plate IN
    Charge Accumulated Summary So Far

    Half Wave Plate Charge Expected (C) Charge Accumulated (C) Comment
    &pi- Vertical IN 3.5 0.86 -
    &pi- Vertical OUT 3.5 4.04 Done

    &pi-Transverse IN 3.5 0.62 -
    &pi- Transverse OUT 3.5 4.38 Done

    &pi+ Vertical IN 3.5 2.56 Currently here
    &pi+ Vertical OUT 3.5 3.72 Done

    &pi+ Transverse IN 3.5 4.5 Done
    &pi+ Transverse OUT 3.5 3.66 Done

    Overall Plans
    1. Will stay at Pi-plus Vertical mode until Thursday Morning.
    2. Will do Moller measurement either on Tuesday or Wednesday.
    3. Will do positron runs on Thursday (Jan 22) Day/Swing and Swing/Owl(Friday) where

    Day/Swing [total one shift, starting ~11:00]: BigBite +ve polarity and L-HRS +ve
    Swing/Owl [total one shift, starting ~19:00]: BigBite +ve polarity and L-HRS -ve

    4. Friday (Jan 23) Day: BigBite will be back to -ve polarity, L-HRS stays at -ve polarity.

    Activities
    - Production in &pi+ Transverse mode until 10:00.
    - 10:00 starts target polarization change from Transverse to Vertical.
    Also asked for opportunistic controlled access to do misc DAQ work
    (L-HRS, RICH) in the hall.
    - 13:50 Target work (Transverse to Vertical polarization change) finished,
    asked for beam tuning for a Compton-quality.
    - 14:30 Reference cell (H2) data taking starts
    - 18:00 Production on polarizide 3He on TRANSVERSE mode starts and continues smoothly.

    Beamtime Accounting:
    ABU BANU BNA Comment
    Owl 6.87 0.17 0.98 half an hour beam stop for MCC work
    Day 2.65 4.36 1.00 Target polarztion state change (T->V), beam tuning.
    Swing 6.61 1.14 0.28