User name Wolfgang
Log entry time 12:30:25 on January21,2009
Entry number 257138
keyword=Day Shift Summary
Shift leader: W. Korsch
TO: M. Canan
Shift worker: S. Golge
8:00 am: Started run 5406 at the beginning of shift. Need to keep an eye on the BB DC trips. Ok so far.
9:10 am: Restarted CODA.
9:15 am: Start run 5407. Short run after CODA reboot
9:25 am: Start run 5408.
10:25 am: Start run 5409.
10:50 am: BB DC high voltage tripped. Stopped run.
10:57 am: Start run 5410.
11:03 am: DT = 100%, Killed coda, ROC9 rebooted.
11:08 am: Run 5411 started.
11:45 am: BB DCs 2 and 3 HV tripped again. This happened during a beam current ramp. Stopped run.
11:52 am: Run 5412 started.
11:55 am: AGAIN BB DC HV trip. Run Stopped. Called MCC -> still ramping beam slowly
12:00 pm: Run 5413 started and stoppes immediately after another HV
trip (BB DC).
12:07 pm: Run 5414 started.
12:15 pm: MCC called to investigate some ion chamber trips in our hall.
12:27 pm: MCC called. The problem for the beam trips could be due
to an "ARC magnet mismatch". MCC called magnet expert to look into it.