    User name adaq

    Log entry time 00:01:33 on January 22, 2009

    Entry number 257201

    keyword=Beam Time Accounting
    Hall A

    01/21/09 1600-2400
    Experiment #: E06-010
    Shift Leader: A. Puckett
    Shift Workers: Y. Ye, K. Chirapatpimol

    16001700180019002000210022002300Total Time
    Acceptable Beam
    in Use
    0.890.970.970.740.900.690.560.876.59
    Beam Available
    but Not in Use
    0.070.010.020.100.000.070.000.000.27
    Beam Not Available
    or Unacceptable
    0.040.020.020.160.100.230.430.131.13
    Accelerator Con-
    figuration Change
    0.000.000.000.000.000.000.000.000.00
    Experiment
    Ready
    1.001.001.001.001.001.001.001.008.00
    Planned Config-
    uration Change
    0.000.000.000.000.000.000.000.000.00
    Unplanned
    Experiment Down
    0.000.000.000.000.000.000.000.000.00
    Hall not
    ready reasons
    Target0.000.000.000.000.000.000.000.000.00
    Data Acq0.000.000.000.000.000.000.000.000.00
    Other0.000.000.000.000.000.000.000.000.00
    HRSL0.000.000.000.000.000.000.000.000.00
    HRSR0.000.000.000.000.000.000.000.000.00
    HALL_OFF0.000.000.000.000.000.000.000.000.00
    Bbite0.000.000.000.000.000.000.000.000.00

    Comments: Changed 20 minutes of BANU between 22:00 and 23:00 to BNAs--(beam not acceptable). We were not taking data because we had to recover the MWDC HVs, which were tripped off as a result of bad beam--all of the HV trips during that hour were correlated with beam trips caused by position excursions.

    Data Entry by: A. Puckett