User name riordan
Log entry time 07:58:26 on January22,2009
Entry number 257260
keyword=Owl Shift Summary
Leader: Seamus Riordan
Target: Al Tobias
Worker: Xinhu Yan
Only one BigBite HV trip this shift and it seemed to be correlated with some weird BPM readings. Otherwise, mostly smooth shift. Roughly 2 hour down for accelerator work. Took production until 05:15 and switched to 3He reference cell. Went to controlled access at 06:40 for BigBite polarity change. Access will continue into next shift.
00:00 Start shift, run 5428 - 3He at 14 uA in progress
00:08 End run 5428 - 1M events, 49.9 mC
00:09 Start run 5429
00:35 MCC calls to say beam will be off for ARC magnet work
00:48 End run 5429 - 315k events, 14.7 mC
02:22 Beam restored - doing beam position checkout
02:35 MCC wants to run tune beam - moved to empty target
02:46 restume position checkout
02:56 spot++ and rates looks good for 3x4 and 6x6 raster
Resume production - start run 5433, Polarized 3He at 14 uA
03:41 BigBite MWDC HV Trip - BPMs went to bad positions
End run 5433 - 611k events, 30.8 mC
03:45 Start run 5434 - 1M events, 50.3 mC
04:50 Start run 5435 - 396k events, 19.9 mC
05:15 Stop run - putting 3He reference in beam and starting tuning
05:37 Start run 5338 - Reference cell (unpolarized) 3He at 14 uA
06:40 Stopped run 5338 - 898k events, 46.9 mC
Going to controlled access for BigBite polarity change
07:30 Techs in the hall starting work