keyword=Run Coordinator Report: Jan 21, 2009
Run Coordinator Report for Jan 21, 2009:
# Polarity status of the spectrometers: BigBite -ve (for e-), L-HRS +ve (for &pi+)
# &pi+Vertical mode with the half-wave-plate IN
Charge Accumulated Summary So Far
Half Wave Plate Charge Expected (C) Charge Accumulated (C) Comment
&pi- Vertical IN 3.5 0.86 -
&pi- Vertical OUT 3.5 4.04 Done
&pi-Transverse IN 3.5 0.62 -
&pi- Transverse OUT 3.5 4.38 Done
&pi+ Vertical IN 3.5 4.90 Currently here
&pi+ Vertical OUT 3.5 3.72 Done
&pi+ Transverse IN 3.5 4.5 Done
&pi+ Transverse OUT 3.5 3.66 Done
Overall Plans
1. Will do Moller measurement on Jan 22, 7 PM.
2. Will do positron runs on Thursday (Jan 22) Day/Swing and Swing/Owl(Friday) where
Day/Swing [starting 07:00]: BigBite +ve polarity and L-HRS +ve
Swing/Owl [starting 17:00]: BigBite +ve polarity and L-HRS -ve
3. Friday 07:30: BigBite will be back to -ve polarity, L-HRS stays at -ve polarity.
4. Will stay for about a week of production in &pi-Vertical mode.
Activities
- The frequent BigBite HV (BB HV) trips becomes less frequent when asked to ramp up the
beam current slowly after a beam trip, this may be just a coincidence.
- 12:15- 15:22 MCC tuning the beam through ARC4 magnet which was causing all the BB HV trips.
- 15:40 Checking beam with BeO and doing spot++ with different raster sizes,
and starts production. Not many HV trips now.
- In the Swing another accelerator magnet (MQA9A23) shows mismatch causing a beam mis-tuning.
This mis-tuning also causes BB HV trips. After tuning through MQA9A23, BB HV trip
gets minimized (just ONE trip during the Owl of Jan 22).
- Production on polarized 3He in &pi-Vertical mode.
Beamtime Accounting:
ABU BANU BNA Comment
Owl 6.99 0.44 0.56
Day 3036 1.12 3.51 3 hrs of Beam tuning through ARC4 magnet
Swing 6.59 0.27 1.13 Beam tuning through the accelerator magnet MQA9A23