Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Carlos
Log entry time 08:02:17 on January24,2009
Entry number 257553
keyword=Owl shift summary
Pretty smooth shift, only disturbed by some BigBite HV trips (which disappeared after adjusting beam position to the center of the target cell) and the alarms of Q1 (still noisy as yesterday). Happex roc28 crashed a few times, too. We took production data for most of the shift. A few events are detailed below.
1.20 some bigbite hv trips
2.00 MCC called. Bringing Hall C up, beam will be off for us for about 5min.
2.15 Beam back. Resuming production.
3.00 BB HV trip
3.45 Jin called MCC to change beam position to reduce BB trips. New values: BPMA (-1.3,2.5), BPMB(-0.8,2.5).