Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Dustin McNulty
Log entry time 11:40:17 on January 24, 2009
Entry number 257582
keyword=Run Coordinator Report for Jan 24, 2009
Run Coordinator Report for Jan 24, 2009:
# Polarity status of the spectrometers: BigBite -ve (for e-), L-HRS -ve
(for pi-)
# pi-Vertical mode with the half-wave-plate IN
Charge Accumulated Summary So Far:
Half Wave Plate Q Expected (C) Q Accumulated (C) Comment
pi- Vert IN 3.5 1.33 here
pi- Vert OUT 3.5 4.04 Done
pi- Trans IN 3.5 0.62 -
pi- Trans OUT 3.5 4.38 Done
pi+ Vert IN 3.5 5.06 Done
pi+ Vert OUT 3.5 3.72 Done
pi+ Trans IN 3.5 4.5 Done
pi+ Trans OUT 3.5 3.66 Done
Overall Plans (for next 24 hours):
1. Will do Moeller measurement today starting at 11:30AM.
2. Continue with production running for pi-Vertical configuration.
Activities (during last 24+ hrs):
- Completed ~8 hrs of positron running for pi- Vertical configuration
(0.32 C accumulated).
- Planned ACCESS (13:15 - 14:15): Todd and Scot change BB polarity
from (+) to (-), Yi adjusts target holding field for negative BB
polarity.
- At 16:30, completed ~1 hr run (5474) on He3 reference cell (cell
at 112 psi and dropping at rate of ~0.4 psi/hr).
- Compton rates erratic during parts of reference cell run. MCC
notified and corrected problem. Compton DAQ crashed twice between
runs 5474 and 5476.
- Labview target control crashed at 17:30. Jin fixed.
- At 17:45, BB deadtime jumped to ~90%. Remote rebooting failed to
remedy problem...Kalyan takes ACCESS (18:30 - 18:45) to power cycle
crates...fixes problem.
- At 22:00, target heater malfunction. Yi takes ACCESS (22:00 - 22:45)
to repair. He replaces fuse. Able to continue production data-taking
however heater temp. control unstable and oscillating between 222 and
232 Celsius.
- Note that hall C getting beam at around 02:00.
- During Owl, BB HV trips twice. Jin asked MCC to tune beam to new
"golden" beam positions: BPMA = (-13, 2.5); BPMB = (0.8, 2.5). This
occurred at 04:00.
- Also during Owl and continuing into the Day, HAPPEX DAQ ROC28 crashes
frequently (5 times since last night) requiring kcoda to repair.
Should look into this.
- MCC having some RF problems this morning between 08:30 - 09:30.
Beamtime Accounting:
ABU BANU BNA Comment
Day 5.14 2.43 0.44
Swing 4.97 2.42 0.60
Owl 6.43 0.53 1.04