keyword=Feb9 Swing shift summary (late entry)
16:00 shift start with Moller measurement.
16:20 Moller fininshed. Vince asked for control access.
18:30 Control access was finished. Ask for beam back.
19:21 beam back, start turning beam.
20:00 fixed the spot++ problem and restart turning beam.
21:12 Just finished the procedures of beam turning on the run-list, MCC
found the compton rate was too high. So ask them work on it. Later
MCC called us saying someone asked a control access again. (see log
entry 260115)
22:00 MCC asked to change target to Optics again, check for beam
position and raster size check.
22:21 Beam come back again, start with Optics target for beam
checking.
22:26 move to He3 target, stat with 6x6 raster to check if the rates
were same. Then go to 2uA 4x4, start taking elastic data.
22:41 Start the first good run#1203.
23:59 shift ends with 4 good run: 1203, 1204, 1205 and 1206,
both of them have 1M event. Run 1207 was started...