• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name R. Subedi

    Log entry time 00:00:19 on February15,2009

    Entry number 261226

    keyword=Shift Summary (Swing)

    16:00 Kinematics "M" (p=1.7 GeV/c, LHRS angle = 45 deg) underway.

    Shift Activity:

    18:11 BB HV trip for S14 and S15. Just disabling the tripped channels and enabling them back repairs the trip.

    22:37 MCC takes away beam for short time to do cavity work. Runs
    20198 (LHRS) and 1447 (BB) topped.
    23:18 MCC has problem with one of the RF controls (CPU). They are waiting for experts to come in. No time estimate.


    Run Start Events Comment

    20197 (LHRS) 16:16 0.75 M Stopped early for Target NMR sweep.
    1436 (BB) 16:20 -- Junk (wrong prescale)
    1437 (BB) 16:21 5 M
    1438 (BB) 16:57 5 M
    1439 (BB) 17:39 4.5 M Run end due to BB HV trip
    1440 (BB) 18:17 5 M
    1441 (BB) 18:54 5 M
    1442 (BB) 19:35 2.58 M Stopped early for Target NMR sweep.
    20198 (LHRS) 19:54 0.56 M Stopped early due to RF problem
    1443 (BB) 19:54 5 M
    1444 (BB) 20:35 5 M
    1445 (BB) 21:13 5 M
    1446 (BB) 21:48 5 M
    1447 (BB) 22:20 1.77 M Stopped early due to RF probem


    No beam at the end of the shift (since 22:37).