NEXT
Make New Entry,
Make Followup Entry
User name R. Subedi
Log entry time 23:49:52 on February25,2009
Entry number 263365
keyword=Shift Summary (Swing)
Kinematics: 4J, Momentum setting: 1.51 GeV/c, LHRS angle: 45 deg
16:00 Inherited smooth production mode on Kin 4J from Day Shift.
22:40 RF trips, beam away for a few minutes, stopped runs.
22:57 Beam is back.
BigBite runs:
Run No Start time Events Comments
1794 16:44 400 k Junk (FADC DAQ configuration)
1795 16:54 7 M
1796 17:40 7 M
1797 18:26 1.9 M Stopped early for BB HV change
1798 18:59 2.1 M Test run for BB HV change
1799 19:16 2 M Test run for BB HV change
1800 19:34 4.7 M Stopped early for BB HV change
1801-1810 -------------------------- All test runs for BB HV change
1811 22:57 contd to next shift.
LHRS runs:
Run No Start time Events Comments
20403 16:35 400 k
20404 18:13 400 k
20405 19:55 400 k
20406 21:35 265 k Stopped due to RF problem
20407 22:59 Contd. to next shift
Charge collected until the run 20406=0.945 C. Needed charge for this
kinematics = 1.08 C. After the run 20407 this kin should be complete.
Next kin is 4C.