    User name R. Subedi

    Log entry time 23:49:52 on February25,2009

    Entry number 263365

    keyword=Shift Summary (Swing)

    Kinematics: 4J, Momentum setting: 1.51 GeV/c, LHRS angle: 45 deg

    16:00 Inherited smooth production mode on Kin 4J from Day Shift.
    22:40 RF trips, beam away for a few minutes, stopped runs.
    22:57 Beam is back.

    BigBite runs:

    Run No Start time Events Comments
    1794 16:44 400 k Junk (FADC DAQ configuration)
    1795 16:54 7 M
    1796 17:40 7 M
    1797 18:26 1.9 M Stopped early for BB HV change
    1798 18:59 2.1 M Test run for BB HV change
    1799 19:16 2 M Test run for BB HV change
    1800 19:34 4.7 M Stopped early for BB HV change
    1801-1810 -------------------------- All test runs for BB HV change
    1811 22:57 contd to next shift.


    LHRS runs:

    Run No Start time Events Comments
    20403 16:35 400 k
    20404 18:13 400 k
    20405 19:55 400 k
    20406 21:35 265 k Stopped due to RF problem
    20407 22:59 Contd. to next shift

    Charge collected until the run 20406=0.945 C. Needed charge for this
    kinematics = 1.08 C. After the run 20407 this kin should be complete.
    Next kin is 4C.