Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Ole Hansen
Log entry time 00:16:13 on February27,2009
Entry number 263602
keyword=Swing Shift Summary
Shift Workers:
Ole Hansen (SL)
Yunxiu Ye (TO)
Dustin McNulty (3rd)
Summary:
Beam was restored after pass change to 5-pass shortly after the start of the shift. We performed the beam checkout procedure. Noticed that the maximum raster amplitude in y at this energy is 3mm, so we continued with a raster size of 3.5x3.0 mm^2. Took reference cell data with N2 for kinematics M, then switched to kinematics K, took reference cell data, then moved on to production with 3He for these kinematics. Beam disappeaed for 45 minutes starting around 21:50 due to rf problems. Beam eventually came back, but availability was still not good for the remainder of the shift (trips for 5-10 minutes at a time).
Runs:
LHRS:
Run #events Comments
20425-20429 -- Junk, checkout, spot checks
20430 112k kine M, N2 reference cell run
20431 142k kine K, N2 reference cell run
20432 O(1e5) kine K, 3He production
20433 in progress
BigBite:
1840-1841 -- junk, checkout
1842-1843 -- prescale factor tests
1844 7M ref cell production
1845 7M
1846 ?
1847 320k 3He production
1848 7M
1849 6M end run because of long beam down
1850 7M
1851 in progress