• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name brads/kalyan

    Log entry time 03:56:38 on March 01, 2009

    Entry number 263956

    Followups:

    keyword=Controlled Access (opportunistic)

    Kalyan and I took a controlled access while the beam was down to do the following:

    1. Measured and added some delay to T2 arrival at the TS.  It had been
       pretty marginal (as noted earlier).
    
    2. Cabled the preshower discriminators back into the T6 trigger.  This
       will shift the T6 timing later by 20ns since the preshower will now
       carry the timing on that trigger.
    

    I'll add some follow-up entries with a little more detail in a bit.