8:05 failure in Left HRS Q1, cooling level < 15%, After few minutes the cooling is back, but Q1 is too "hot" and reset fails due to overtemperature. We wait for a while to reset it again
8:20 beam line trip, the same happened during the owl shift, MCC says
8:25 beam back
8:27 Left Q1 still failing, Gary paged. He says that if remote reboot fails we need an access to reboot manually
8:37 Asked for controlled access
8:45 Brad called saying about the hardware reset on the middle room, it works, we cancel the controlled access
9:00 Q1 recovered, we go back into production
9:24 beam trips again, still problem in vacuum line
9:29 beam back
9:32 BB channel 14.6 tripped
9:45 beam trips again
10:35 Beam is coming back
12:55 NMR measurement
13:35 Beam off for a while
14:05 Beam is back
15:00 We changed kinematics into G, reference cell in
15:15 calibration run with N2 reference cell
15:55 He-3 target moved in
16:00 start production at kinematics G