Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name brads
Log entry time 16:42:27 on March 2,2009
Entry number 264200
keyword=LHRS set to 1.270 GeV/c
LHRS set to 1.270 GeV/c (positive). Quads cycled. Dipole still settling.
VDC HV still needs to be turned on.
VDC disc. still needs to be re-enabled (Jack's looking into the voltage drift from these power supplies).
FIGURE 1