• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name brads

    Log entry time 16:42:27 on March 2,2009

    Entry number 264200

    keyword=LHRS set to 1.270 GeV/c

    LHRS set to 1.270 GeV/c (positive). Quads cycled. Dipole still settling.

    VDC HV still needs to be turned on.

    VDC disc. still needs to be re-enabled (Jack's looking into the voltage drift from these power supplies).


    FIGURE 1