NEXT
Make New Entry,
Make Followup Entry
User name S. Sirca
Log entry time 15:57:19 on March 5,2009
Entry number 264757
keyword=DAY shift summary
DAY shift summary: S. Sirca (SL), H. Gao TO), D. McNulty (3rd)
==============================================================
EVENTS
------
08:00 took over at run #3978 from owl shift
09:30 switch to kinematics G (HRSL down to 1.200 GeV/c)
09:36 started new Compton (#16209, #60735) and parity (#30948) runs
11:00 reference (N2) cell runs #2000 (BB) and #20547 (HRSL)
11:40 back to production running with runs #2001/#20548
11:59 take beam half-wave plate OUT
12:40 a sequence of beam fluctuations trips all BB WC HVs
13:51 beam OFF (arc magnet problems)
RUNS
----
Bigbite:
07:25-08:19 #1994
08:25-08:59 #1995
09:01-09:29 #1996 (last run at kinematics I)
09:33-10:17 #1997 (first run at kinematics G)
10:20-10:58 #1998
11:03-11:04 #1999 (junk run to set prescales)
11:07-11:40 #2000 (N2 reference cell run)
11:43-11:58 #2001
11:59-12:40 #2002
#2003 (not a production run: just to see the rates during beam-pos checks)
13:48-13:51 #2004 (beam OFF)
HRSL:
07:25-09:30 #20545 (last run at kinematics I)
09:38-11:01 #20546 (first run at kinematics G)
11:03-11:40 #20547 (N2 reference cell run)
11:43-11:58 #20548
11:59-12:40 #20549
#20550, 20551, 20552 (runs for spot++ checks)
13:38-13:51 #20553 (beam off)
Compton:
until 09:36 #16208/#60374
since 09:36 #16209/#60375
since 11:32 #16210, since 11:41 #60376
parity:
until 09:36 #30947
since 09:36 #30948
since 11:42 #30949