User name riordan
Log entry time 17:52:00 on March 05, 2009
Entry number 264766
keyword=Summary for March 4 Swing - March 5 Day
Summary for Mar 4 swing - Mar 5 Day
Beam was down for about 3.5 hours in swing due to magnet problems in
the accelerator.
Production through the night until about 14:00 when the beam stopped
due to a different ARC magnet problem.
Beam in Use
Shift |
ABU |
BANU |
BNA |
2009/03/04 Swing | 4.25 |
0.25 | 3.50 |
2009/03/05 Owl | 7.33 |
0.09 | 0.59 |
2009/03/05 Day | 4.34 |
0.51 | 3.14 |
TOTAL | 15.92 |
0.85 | 7.23 |
Main events/issues:
- Mar 3
- Down from 17:00-20:30
- Continuing production on Kin I
- Mar 4
- 9:30 starting production on Kin G
- 12:00 half wave plate moved to OUT
- Down from 14:00 to 17:35 due to ARC magnet problems
Plans for the next few days:
- Continue 5-pass transverse production until pass change.
- Pass change will occur noon Friday.
- Will start 4-pass running with about 24 hours of longitudinal
polarization data taking. Moller will be done Friday night.
- 4-pass positron running for LHRS and BigBite likely take place on
Monday day.
A copy of this log entry has been emailed to: brads, jpchen, jiang, meziani, choi, riordan