Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name O. Glamazdin
Log entry time 20:26:15 on March 06, 2009
Entry number 264979
keyword=Moller measurements result
Moller results on Mar 6 17:00-20:10
- Crew: E. Chudakov, O.Glamazdin
- Tuning took 1h30min. In the beginning the Moller dipole setting
was wrong again.
- There was an energy lock in ARC2 using a tool called "PID". It
seems it does not work properly.
- The raster was ON. The half wave plate was OUT.
- For the beam energy current - see the chart attached.
Preliminary results: not corrected for the beam
energy fluctuations.
# |
Wien angle |
beam |
runs |
target |
Ptarget% |
Pbeam% |
comments |
1 | -18° | 1.0 µA
| 13252-13255 | 5 | 8.03 |
66.0±0.2±2.0 | |
2 | -18° | 1.0 µA
| 13256-13259 | 5 | 8.03 |
65.6±0.2±2.0 | No aperture counter |
3 | -18° | 1.0 µA
| 13260-13263 | 4 | 7.51 |
64.40±0.2±2.0 | |
4 | -18° | 1.0 µA
| 13264-13265 | 5 | 8.03 |
65.4±0.3±2.0 | |
Aver. | -18° | 1.0
µA | - | 4-5 | - |
65.3±0.1±2.0 | Targets 4 and 5 |
A copy of this log entry has been emailed to: gen@jlab.org
Figure 1

Figure 2
