NEXT
Make New Entry,
Make Followup Entry
User name Solvignon
Log entry time 16:05:58 on March 7,2009
Entry number 265146
keyword=Shift summary
DAY shift summary: P. Solvignon (SL), A. Deur (TO), Nuruzzaman (3rd)
=========================================================================
EVENTS
------
08:00 took over just after BHWP changed from OUT to IN
11:50 NMR measurement: 57.32%
14:40 MCC called about their problem with beam delivery. They are waiting for
the expert to come in and change a power supply card. In the meantime they can send us beam while waiting for the expert.
15:54 RC called to ask that we lower the beam current because the deadtime is too high.
15:58 MCC called to start the card change in a power supply.
RUNS
----
Bigbite:
08:01-08:50 #2040 prod, good
08:50-09:43 #2041 prod, good
09:43-10:43 #2042 prod, good
10:44-11:30 #2043 prod, good
11:31-11:49 #2044 prod, good
11:51-12:39 #2045 prod, good
12:40-12:49 #2046 prod, good --> stopped because of beam problem
12:56-12:58 #2047 prod, good --> stopped because of beam problem
13:11-14:06 #2048 prod, good
14:06-14:26 #2049 prod, good --> stopped because of beam problem
14:37-15:32 #2050 prod, good
15:32-15:56 #2051 prod, good
15:59- #2052 prod
HRSL:
08:01-11:48 #20578 prod, good
11:51-12:49 #20579 prod, good
12:56-12:58 #20580 prod, good --> stopped because of beam problem
13:11-14:26 #20581 prod, good --> stopped because of beam problem
14:37-15:56 #20582 prod, good --> stopped because of beam problem
15:59- #20583