Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name O. Glamazdin
Log entry time 20:05:06 on March 12, 2009
Entry number 265694
keyword=Moller results
Moller results on Mar 12 18:00-19:40
- Crew: A. Saha, O.Glamazdin
- Tuning took 45min.
- There was an energy lock in ARC2 using a tool called "PID". An
energy was locked (see chart attached).
- The raster was ON. The half wave plate was OUT.
Preliminary results: not corrected for the beam
energy fluctuations.
# |
Wien angle |
beam |
runs |
target |
Ptarget% |
Pbeam% |
comments |
1 | 21.2° | 1.0 µA
| 13267-13271 | 5 | 8.03 |
-61.5±0.2±2.0 | |
2 | 21.2° | 1.0 µA
| 13272-13275 | 4 | 7.51 |
-60.3±0.2±2.0 | |
Aver. | 21.2° | 1.0
µA | - | 4-5 | - |
60.8±0.1±2.0 | Targets 4 and 5 |
A copy of this log entry has been emailed to: gen@jlab.org
Figure 1

Figure 2
