    Owl shift summary: Miha Mihovilovic (SL), Huan Yao (TO)
    ===================================================================

    EVENTS
    ------
    00:00 Start of the OWL shift. We are in production mode
    and are taking 3He data (Kinematics 4C).

    01:42 Changed the momentum of the HRS-L spectrometer to
    0.6 GeV (Moved to kinematics 4A.) and moved the target
    to Nitrogen. The pressure in the target was 114psi.

    02:27 We moved the target back to the 3He target.

    02:28 There is missing a End-of-run-file for the HRS-L
    run #20674.

    04:18 There was a trip in Big-Bites second wire chamber.
    The channel L14.6 tripped. We have stopped both
    runs (#2146, #20676), waited a few minutes and than
    proceeded with production runs.

    05:15 We made a NMR measuremend of the target. The polarization
    is 62.47%

    08:00 At 07:55 MCC started giving us only 0.5 uA beam. I have
    called them and asked why? They had no good explanation,
    and promised to give us back 15 uA.


    RUNS
    ----

    Bigbite:

    23:30-00:35 #2142 3He produnction run, Num. ev = 6.5M, Q = 0.044
    00:38-01:33 #2143 3He produnction run, Num. ev = 6.5M, Q = 0.044
    01:49-02:19 #2144 N2 callibration run, Num. ev = 4 M
    02:26-03:21 #2145 3He produnction run, Num. ev = 6.5M, Q = 0.045
    03:22-04:16 #2146 3He produnction run, Num. ev = 6.1M, Q = 0.045
    04:22-05:13 #2147 3He produnction run, Num. ev = 6.5M, Q = 0.045
    05:15-06:10 #2148 3He produnction run, Num. ev = 6.5M, Q = 0.045
    06:11-07:08 #2149 3He produnction run, Num. ev = 6.5M, Q = 0.046

    HRSL:

    23:31-00:35 #20672 3He produnction run, Num. ev = 783k, Q = 0.044
    00:38-01:33 #20673 3He produnction run, Num. ev = 761k, Q = 0.044
    01:49-02:19 #20674 N2 callibration run, Num. ev = 1M
    02:26-03:21 #20675 3He produnction run, Num. ev = 1.3M, Q = 0.045
    03:22-04:20 #20676 3He produnction run, Num. ev = 1.5M, Q = 0.045
    04:22-05:14 #20677 3He produnction run, Num. ev = 1.3M, Q = 0.045
    05:15-06:10 #20678 3He produnction run, Num. ev = 1.3M, Q = 0.045
    06:11-07:08 #20679 3He produnction run, Num. ev = 1.4M, Q = 0.046