Log entry time 16:36:14 on March24,2009
Entry number 266546
keyword=baseline DAQ configs ready
Here are DAQ configs to start off. At present, these all download
and "run", but there are missing gates and triggers because
there is still some cabling in progress.
These are all unbuffered at the moment.
I. Left HRS ... (+ BB parasites)
Runs on adaql2 on a-onl account. Run numbers < 20,000.
Trigger supervisor on BB = ts12.
CODA Configs:
a) LeftHRS : All L-HRS crates plus the BB crates roc5,9,10,ts12.
b) LeftOnly : Really only L-HRS. But the TS is still ts12.
c) bigbite : Only bigbite. Not sure we need this.
II. Right HRS
Runs on adaql1 on adev account. Run numbers > 20,000.
Trigger supervisor on RightHRS = ts0
RightHrs : Obvious. But doesn't have HAND yet. (Will later.)
=============================================================
Work to do:
1. Create the buffered versions of these.
2. Add HAND to RightHRS.
3. Finish scalers on RightHRS (5-fold norm scaler, etc)
4. Replace 1875 by 1877 (I think Vince did this already).
5. Add C830 scaler to BB VME crate (it replaced some SIS3800).
6. Finish trigger on RightHRS (Bo and Ramesh working on it).
7. Prepare MLU files for T2,T4.
8. Verify Lumi data in each HRS datastream.
9. Synch checks (I'm vague on what Xiaodong wanted here.)
10. Pulser timing (EDTM) tests where relevant.
11. Update the start-run / end-run scripts