• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Moffit

    Log entry time 20:05:01 on March 24, 2009

    Entry number 266548

    keyword=Problem found with T3 delay at BB weldment.

    Found that one of the patch cables (1ns twisted pair) for T3 at the CAMAC crate was half-seated in it's channel at the delay module.

    The signal still went through, but effectively (time difference measured on scope) added 16ns onto the delay of T3.

    Using the script I wrote for t3_delay... setting the "delay" to 0ns had given total delay of 58.4ns. After re-seating the patch cable, the total delay is 40ns.

    I guess this only makes a difference for coincidence mode... and only after the cable was not seated correctly.

    A copy of this log entry has been emailed to: brads, kalyan