    Followups:

    keyword=Laser power test and EPR aligment done

    All 6 lines (3 for vertical, 3 for transverse) have power drop less than 20%(close to 10 to 15%) from laser room to optics and more details will be posted later. The oven temperature was ramped to 220 C and with this temperature we adjusted the EPR D2 fiber. As a result, we have 80mV for vertical pumping and 25mW for transverse pumping, and this should be large enough. Unfortunately, we couldn't find the light tube for the BeO target :S Other than this, all system has been sealed up and is ready for the inspection.

    A copy of this log entry has been emailed to: jpchen, folts, miham, yawei, yqiang