keyword=Laser power test and EPR aligment done
All 6 lines (3 for vertical, 3 for transverse) have power drop less than
20%(close to 10 to 15%) from laser room to optics and more details will
be posted later. The oven temperature was ramped to 220 C and with this
temperature we adjusted the EPR D2 fiber. As a result, we have 80mV for
vertical pumping and 25mW for transverse pumping, and this should be
large enough. Unfortunately, we couldn't find the light tube for the BeO
target :S Other than this, all system has been sealed up and is ready for
the inspection.
A copy of this log entry has been emailed to: jpchen, folts, miham, yawei, yqiang