    keyword=Shift Summary

    During the first part of shift, we found the center of the 3He cell was nearly the same as the reference cell and set a nominal beam center as x=-0.5 and y=2.0 mm for both 1H04A & B.

    Requesting a 6mm by 5mm raster from MCC put a 4mm by 4mm raster on target.

    We took Hydrogen data with 2uA with all detectors on
    (runs 1332/1333 & 20312/20213)

    And a run with 3He (1334/20214)

    Next we took beam current calibration data. (see log 267894)