User name miham
Log entry time 01:40:29 on April 30, 2009
Entry number 269864
keyword=Ready for the production running (Preformatted this time)
We have made a series of tests to see if the beam spot is OK,
and checked the T3 rates:
1.) 2uA beam with raster (4x4mm): T3 = 1.82E2 Hz
2.) 2uA beam with raster (2x2mm): T3 = 1.73E2 Hz
3.) 2uA beam with raster (6x6mm): T3 = 1.89E2 Hz
Since the rates look OK, we have decided to move on and start
with production running. We have set the prescales to the
following values:
LT3 = 5.0E2 Hz => LPS3 = 1
LT4 = 3.1E1 Hz => LPS4 = 1
RT1 = 4.0E2 Hz => RPS1 = 1
RT3 = 3.8E1 Hz => RPS2 = 1
Unfortunately we can not start with production running just yet,
because of the problems with the HAPPEX DAQ.
A copy of this log entry has been emailed to: peter, miham, sirca