Swing Shift Summary
4pm production running on 3He polarized target
16:40 install 3He reference cell, pressure = 128 psig,
production runs: 1770, 20676,
17:37 evacuate, pump, purge reference cell (remove 3He gas)
Fill reference cell with 10 psig of N2 gas.
Runs 1772, 20678
18:15 evacuate, pump, purge reference cell (remove N2 gas)
Fill reference cell with 130 psig of H2 gas.
Runs 1774, 20680
19:16 evacuate reference cell, P=-20 psig,
empty reference cell runs 1775, 20681
19:30 move polarized 3He cell into beam. Force spin flip after putting target into beam position, new polarization is only 45.7% (was about 60% before reference cell runs), resume production running
21:05 after runs 1777 and 20683 and HAPPEX 31313, we asked MCC to move the beam half-wave plate to OUT; resume production running