• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name golge

    Log entry time 00:02:31 on May 6,2009

    Entry number 271180

    keyword=hall a tools

    hall a tool snapshot


    FIGURE 1
    ge


    4:00 Carbon target, 5uA, raster4x4, confirm raster size
    4:10 Carbon target, 5uA, raster2x2, confirm raster size
    4:19 Carbon target, 5uA, raster6x6, confirm raster size
    4:31 Production cell, 2uA, raster2x2, T3=171
    4:37 Production cell, 2uA, raster6x6, T3=177
    4:44 Ready to production, 10uA, raster4x4, but RHRS has high deadtime, Brayan is trying to fix.
    6:05 Controlled access, Ramesh down to the hall to fix crazy RHRS T8.
    7:00 Controlled access finished, deadtime of RHRS around 15%.
    7:19 Carbon target, 5uA, raster4x4, confirm raster size
    7:27 Production cell, 2uA, raster2x2, T3=175
    7:30 Production cell, 2uA, raster6x6, T3=185
    7:44 Ready to production, 10uA, raster4x4, but Lumi DAQ is not working, trying to fix.
    8:05 Take run#1881 and run#20788 without Lumi.
    8:26 Lumi DAQ is back, take production run#1882 and run#20789 with Lumi.
    8;15 move target to reference cell, fill H2 into the cell, 135psig.
    8:19 2uA, 4x4 check raster size.
    8:24 10uA, take reference cell(H2) 1M events production run#1884 and run#20791, beam down 6 minutes.
    10:07 10uA, take reference cell(H2) 1M events production run#1885 and run#20792.
    10:52 2uA, 3He target, check spot++
    11:05 beam down, MCC said that CHL is down due to a lighting, will take at least 4 hours to fix.


    Production runs:
    LHRS/RHRS
    1881/20788(without Lumi)
    1882/20789
    1884/20791(reference cell: H2)
    1885/20792(reference cell: H2)