User name Yawei
Log entry time 13:51:25 on May 06, 2009
Entry number 271229
This entry is a followup to: 271179
keyword=Swing shift summary(May 5th)
Leader: Yawei Zhang
TO: Chunhua Chen
Third person: Serkan Golge
16:03: raster check, 4x4, BeO target, 5uA
16:10: raster check, 2x2, BeO target, 5uA
16:19: rasrer check, 6x6, BeO target, 5uA
16:31: T3 check, 2x2, 3He target, 2uA, T3=171
16:38: T3 check, 6x6, 3He target, 2uA, T3=177
16:44: ready to take production run, 4x4 raster size, but RHRS has high
deadtime, Brayan is trying to fix.
17:50: Controlled access, Ramesh down to the hall to fix the crazy RHRS T8.
19:25: Controlled access end, recheck raster size and T3. Lumi DAQ does
not work, Peter is trying to restart it.
20:06: Take 3He run#1881, #20788 without Lumi.
20:26: Peter restart the Lumi DAQ with Bob's help. Start production
run#1882, #20789 with Lumi.
21:18: Move target to Reference Cell, fill H2 into cell,135psig, raster
size 4x4, check spot++, 2uA
21:24: Take H2 Calibration run#1884, #20791, 10uA, raster size4x4
22:07: Take H2 Calibration run#1885, #20792, 10uA, raster size4x4
22:54: Move target to 3He, check spot++, 4x4, 2uA
23:02: MCC called , it seems that CHL is down due to a lightning . Will
take at least 4 hours to fix.
Calibration runs:
LHRS/RHRS
1884/20791
1885/20792
Production runs:
LHRS/RHRS
1882/20789
A copy of this log entry has been emailed to: peter@jlab.org