Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name A. Camsonne
Log entry time 19:24:21 on May 07, 2009
Entry number 271562
keyword=Electron detector test plan
We got the authorization from MCC to put the Compton eletron detector in
beam. The safety measured implemented have been reviewed to be safe for
data taking and an additionnal software interlock will be put on the
detector position which will trip the beam if the detector is moved out
from the set position.
Corresponding ELOG can be found, with a small write up by me summarizing
the safety implementation.
http://opweb.acc.jlab.org/CSUEApps/elog02/elog_item.php?elog_id=1469153