• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name A. Camsonne

    Log entry time 19:24:21 on May 07, 2009

    Entry number 271562

    keyword=Electron detector test plan

    We got the authorization from MCC to put the Compton eletron detector in
    beam. The safety measured implemented have been reviewed to be safe for
    data taking and an additionnal software interlock will be put on the
    detector position which will trip the beam if the detector is moved out
    from the set position.

    Corresponding ELOG can be found, with a small write up by me summarizing
    the safety implementation.

    http://opweb.acc.jlab.org/CSUEApps/elog02/elog_item.php?elog_id=1469153