Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name jpchen
Log entry time 16:08:58 on May 8,2009
Entry number 271749
keyword=Day shift summary
Day shift summary:
Shift workers: J. P. Chen (SL/TO), R. Lindgren (3rd).
8:00 taking production data at 3 pass.
E=3606 MeV, P(both L &R)=3065.5 MeV. Angle=17 degree.
BCMs still jumping (problem known from previous shift).
Runs taken with L buffer mode, T3/T4/T8
R un-buffer mode, T1/T8. T2 prescaled away.
Two runs (20876,20877) with Right P2 set to 1 to take T2 as well.
10:45-11:00 Yi/Alexandre do a test with Compton off to see if
this is related to the BCM problem (result: probably not?).
11:00 Left Coda begin run failed due to ROC5 not responding.
Rebooted ROC5 and restarted coda, all are fine.
Run 1956/1957 not exist.
12:00 pass change starts (3 --> 2 pass) Hall in controlled access.
Hall Controlled access activities:
1) Bo/Vince, ROC8 busy problem.
2) Ramesh/Xiaochao, PVDIS DAQ.
3) Doug, BPMs.
1:30 all out of hall. 1:45 pm beam permit.
2:30 beam back.
position
harp scan,
BeO check
Raster check still gonig on at the end of shift.
All runs afterwards are for raster checks.
Run information
Left/right, time, events, deadtime(%), comments
1952/20874 7:31-8:19, 2M/1.4M, 6/13, New Happex run 31339
1953/20875 8:20-9:02, 2M/1.4M, 5/13,
1954/20876 9:09-9:54, 2M/1.4M, 6/17, changed right P2=1.
1955/20877 9:56-10:42, 2M/1.4M, 5/17, right P2=1.
1958/20878 11:08-11:53, 2M/1.4M, 6/10. right P2=16777217.
1959/20878 11:53-12:00. 0.2/0.14M. 6/9.
afterwards for raster check.