Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Xiaohui Zhan
Log entry time 00:00:43 on May 9,2009
Entry number 271905
keyword=shift summary
Shift start at 16:00:
continue with raster size check MCC 7.3X 5.3 gives us 4X4 raster size.
change target to 3He and start auto flip.
prescale adjusted according to the raw rate and start production:
runs:
1970 20890
1971 20891
1973 20893
1974 20894
1975 20895
1976 20896
dead time test run
1977 20897 5uA right ps2->max
1978 20898 5.5uA right ps2->max
back to production:
1979 20899 5.5uA right ps2->10
19:00 beam off, MCC called that they have some problem, should send beam back soon...
19:30 beam is back! continue production
1980 20900
1981 20901
20:15 MCC called and they have some problems with RF, not clear how soon they can solve it... stop the runs.
20:30 beam is back, continue production.
1982 20902
1984 20904 reference cell empty 200K
1985 20905 reference cell N2 20psig 200K
1990 20910 reference cell N2 20psig 1M
1992 20912 reference cell empty 200K
1995 20915 reference cell H2 135psig 1M
Moved the target to empty. Alex wants to do some chicane test.