Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name R. Lindgren
Log entry time 11:44:10 on May 9,2009
Entry number 272094
keyword=Summary of events from 10:00 to 11:30
10;00 Increase Raster to 6 x 6
10:15 DAQ Crashed again
Do not know what is wrong with DAQ
Decide to check to see if it is correlated with beam
Request MCC to mask target
Move target to empty position
Request MCC to move beam y position from 2.9 to 2
Decrease Raster size to 4 x 4
DAQ is now working
Mask target
Move to 3He
Take 2 ua beam Raster size 4 x 4 start DAQ Runs 2034 and 20944 DAQ ok
Take 2 ua beam Raster size 6 x 6 start DAQ Runs 2035 and 20945 DAQ ok
Request MCC to increase beam from 2 to 5.5 ua and reduce raster
to 7 x 5
RASTER Problem Caused by MCC
Raster vertical accidentally increased dramatically causing
HAND detector high voltage alarm went off
Polarized target tempaerature and oven alarm went off.
Call MCC stop beam
Raster back to normal 7 x 5
Target temperature coming back to normal
Move to empty target position
decrease beam to 2 ua
start DAQ ok
Raster ok
Move to 3He target
Check beam 2ua Raster and DAQ ok
Increase beam to 5.5 ua DAQ still okay
Back to production running.