Tuesday, May 5, 2009
|
ABU |
BANU |
BNA |
Owl |
5.03 |
0.14 |
2.82 |
Day |
0 |
0.58 |
7.42 |
Swing |
3.34 |
2.83 |
1.83 |
Total |
8.37 |
4.55 |
12.07 |
· 00:00 – 05:55 Production with 3-pass beam: 10uA
· 05:55 – 06:35 MCC cavity and FOPT problem
· 06:36 – 07:00 Production with 3-pass beam: 10uA
· 07:00 – 14:40 Beam study
· 14:40 – 16:45 Establish beam and quality check
· 16:45 – 17:50 R-HRS high dead time
· 17:50 – 19:25 Controlled access: fix crazy R-HRS T8
· 19:25 – 20:00 Establish beam and quality check
· 20:00 – 21:20 Production with 3-pass beam: 10uA
· 21:20 – 23:00 Reference cell measurements: H2@135psig
· 23:00 – 24:00 CHL down due to lightning
Wednesday, May 6, 2009
|
ABU |
BANU |
BNA |
Owl |
0 |
0 |
8 |
Day |
0 |
0 |
8 |
Swing |
1.93 |
1.82 |
4.25 |
Total |
1.93 |
1.82 |
20.25 |
· 00:00 – 08:00 CHL down due to lightning
· 01:00 – 06:00 HRS magnets recovery
· 08:00 – 21:00 Beam study and recovery
· 08:30 – 21:00 Controlled access:
o Moved Neutron Detector to 62.5 degrees and 6 m from target
o R-HRS busy signal check: ROC8 busy signal -> Workaround with R-HRS un-buffered mode
· 21:00 – 21:45 Establish beam and quality check
· 21:45 – 24:00 Production with 3-pass beam: 10uA
· 23:30 BCM problem starts
Thursday, May 7, 2009
|
ABU |
BANU |
BNA |
Owl |
7.08 |
0.34 |
0.58 |
Day |
3.42 |
1.82 |
2.75 |
Swing |
5.62 |
2.01 |
0.37 |
Total |
16.12 |
4.17 |
3.70 |
· 00:00 – 09:00 Production with 3 pass beam: 10uA
· 04:00 – 09:00 Happex DAQ down
· 09:00 – 09:30 Controlled access: Rebooting Happex DAQ ROC26
· 13:15 – 14:30 MCC RF Power Supply Repair. Controlled access:
o First attempt to fix BCM
o ROC8 busy signal
· 14:30 – 15:50 Establish beam and quality check
· 15:50 – 17:30 Production with 3-pass beam: 10uA
· 17:30 – 21:50 Controlled access to diagnose R-HRS high dead time and identified it as the after pulsing problem from s2 PMTs. Use multi-hit TDC as a workaround.
· 21:50 – 22:30 Establish beam and quality check
· 22:30 – 24:00 Production with 3-pass beam: 10uA
Friday, May 8, 2009
|
ABU |
BANU |
BNA |
Owl |
7.22 |
0.12 |
0.65 |
Day |
3.43 |
0.84 |
3.73 |
Swing |
4.04 |
1.39 |
2.55 |
Total |
14.69 |
2.35 |
6.93 |
· 00:00 – 12:00 Production with 3-pass beam: 10uA
· 12:00 – 14:30 Pass change to 2 passes. Controlled access
o ROC8 busy problem
o PVDIS DAQ
o Fix BCM: faulty DC power supply
· 14:30 – 16:45 Establish beam and quality check
· 16:45 – 21:00 Production with 2-pass beam: 5.5uA
· 21:00 – 24:00 Reference cell measurements: H2@135psig, Empty, N2@20psig