Log entry time 09:20:13 on May11,2009
Entry number 272527
keyword=Day shift summary
Day shift summary:
Shift workers: J. P. Chen (SL), M. Canan (TO).
8:00 continue production run with left arm, BB on.
Right VDC tripped earlier.
run 2105 7:24-8:08, 5.5uA on V pol He3, 5M, 14% DT, only left (right not taking data due to VDC off), BB on.
run 2106 8:10-8:32. 2.36M, 14%, BB on. right off.
8:32 Beam off. Stopped production, End of E05-015/E08-005.
Started switch-over to E05-102. Target cell switch and many other
works. Hall will go into restricted access after radcon survey
(request to MCC after Ed and run coordinator concurred).
Yi turned off and lock-out lasers. Turned off oven.
8:40 Radcon arrived. Went to the hall with Yi.
9:00 Radcon finished survey. Hall in restricted access.
See separate log enrty on planed hall acitivities.
Only TO will stay for the shift.