    1. Removed the Ay cell: Dominic;
    2. Installed new ee'd cell: Moss;
    3. Target position surveyed;
    4. Swapped 75m fibers from vertical to longitudinal;
    5. longitudinal laser aligned;
    6. transverse laser aligned;
    7. EPR D2 assembly adjusted for both longitudinal and transverse
    pumping;
    8. Adjusted transverse pumping chamber pickup coil for vertical RF;
    9. Found the heater thermal couple bad, replaced it with a spare;
    10. Realigned rotatable Q-wave plates for longitudinal pumping;
    11. Adjusted other two longitudinal Q-wave plates with new settings;
    12. Did a very rough EPR calibration for longitudinal direction;
    13. Started first longitudinal pumping up.