Log entry time 06:00:11 on May 12, 2009
Entry number 272662
keyword=Target Activities
1. Removed the Ay cell: Dominic;
2. Installed new ee'd cell: Moss;
3. Target position surveyed;
4. Swapped 75m fibers from vertical to longitudinal;
5. longitudinal laser aligned;
6. transverse laser aligned;
7. EPR D2 assembly adjusted for both longitudinal and transverse
pumping;
8. Adjusted transverse pumping chamber pickup coil for vertical RF;
9. Found the heater thermal couple bad, replaced it with a spare;
10. Realigned rotatable Q-wave plates for longitudinal pumping;
11. Adjusted other two longitudinal Q-wave plates with new settings;
12. Did a very rough EPR calibration for longitudinal direction;
13. Started first longitudinal pumping up.