    Day Shift 5/14/2009
    John LeRose (SL)
    Blaine Norum (TO)
    Doug Higinbotham (3rd)

    Program is Beam studies
    Tim (previous SL) called for controlled access at ~07:00
    08:27 Controlled Access
    08:50 Survey is completed and the Hall is open.

    13:00 MCC says about 30 minutes to beam (moved target to empty position)
    14:11 Everyone is out of the Hall, going to power permit
    14:25 Beam Permit, starting tune beam
    14:35 going CW
    14:40 MCC doing harp scans

    15:09 2229 & 21136 started (Production 3He, no Q1)
    15:12 21137 (Production 3He, no Q1)
    15:14 2230 (Production 3He, no Q1)
    15:20 start of Moller measurement (turned off BigBite HV)
    15:30 discovered that Q1 on both arms were off
    (Regulator was turned off. They were OK before the controlled access)
    15:35 Q1's are restored
    Moller work continues at the end of the shift