User name LeRose
Log entry time 16:03:52 on May 14, 2009
Entry number 273361
keyword=Shift Summary (Day)
Day Shift 5/14/2009
John LeRose (SL)
Blaine Norum (TO)
Doug Higinbotham (3rd)
Program is Beam studies
Tim (previous SL) called for controlled access at ~07:00
08:27 Controlled Access
08:50 Survey is completed and the Hall is open.
13:00 MCC says about 30 minutes to beam (moved target to empty position)
14:11 Everyone is out of the Hall, going to power permit
14:25 Beam Permit, starting tune beam
14:35 going CW
14:40 MCC doing harp scans
15:09 2229 & 21136 started (Production 3He, no Q1)
15:12 21137 (Production 3He, no Q1)
15:14 2230 (Production 3He, no Q1)
15:20 start of Moller measurement (turned off BigBite HV)
15:30 discovered that Q1 on both arms were off
(Regulator was turned off. They were OK before the controlled access)
15:35 Q1's are restored
Moller work continues at the end of the shift