Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name jpchen
Log entry time 00:05:44 on May20,2009
Entry number 274924
keyword=swing shift summary
Swing shift summary
shift workers: J. P. Chen (SL), K. Pan(TO), B. Norum (3rd).
16:00 Hall in power permit -> beam permit.
16:15 2 uA position at (-0.5,2), with raster off, BeO position
checked fine.
16:20 harp scan, size fine.
16:25 Raster 4x4 (MCC 7x5), checked fine.
16:33 Beam off, MCC need access NL to restart turbo pump at 1L06.
~1 hour.
17:30 MCC called to inform us that they will need to replace turbo,
estimation ~2 hours down.
17:35 moved target to pol. He3.
18:30 NMR=47%, moved back to BeO
19:10 beam back. position check 2 uA on BeO, spot check.
19:15 asked for harp scan, 5uA.
19:25 asked for raster 4x4 (MCC 7x5)
19:35 Filled reference cell to 135 psig H2, moved to reference cell.
19:35-19:55 checked raster on reference cell: 4x4, 6x6, then 2x2.
20:00 started production 10 uA on H2, raster 4x4. 2477/21386.
started happex run 31386.
21:30 started production 5uA on multi-12C.
22:00 moved to pol. He3, NMR=50.55%. Lower than expected.
22:00 started production 10uA on pol. He3.
23:00-23:10 EPR to check target polarzation. 52%-47%.
23:10 restart production on pol. He3.
run L/R
2470/21376 raster check 4x4, 2uA on BeO
2472/21381 spot check, raster off, 2uA on BeO
2473/21382 raster check 4x4, 5uA on BeO
2474/21383 raster check 4x4, 5uA on 135 psig H2
2475/21384 raster check 6x6, 5uA on H2
2476/21385 rsater check 2x2, 5uA on H2
Production runs (reference H2/multi-12C)
2477/21386 10uA on H2 4M/4.5M
2478/21387 10uA on H2 4M/4.5M
2479/21388 5uA on multi-12C, .3M/.4M, right deadtime high (26%),
2480/21389 5uA on multi-12C, 4M/3.5M. changed PS1=2 (right).
Prodcution runs on pol. He3
2481/21390 10uA on pol. He3, 4M/4.3M
2482/21391 10uA on pol. He3, 4M/4.3M
2483/21392 10 uA on He3. 4M/4.3M
2484/21393 10uA on He3, still ongoing at the end of shift.