1600 | 1700 | 1800 | 1900 | 2000 | 2100 | 2200 | 2300 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 0.89 | 0.92 | 0.90 | 0.79 | 0.66 | 0.38 | 0.58 | 0.88 | 6.00 |
Beam Available but Not in Use | 0.05 | 0.06 | 0.07 | 0.08 | 0.09 | 0.13 | 0.38 | 0.06 | 0.94 |
Beam Not Available or Unacceptable | 0.05 | 0.02 | 0.03 | 0.13 | 0.25 | 0.47 | 0.03 | 0.06 | 1.04 |
Accelerator Con- figuration Change | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Experiment Ready | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 0.92 | 0.58 | 1.00 | 7.50 |
Planned Config- uration Change | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Unplanned Experiment Down | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.08 | 0.42 | 0.00 | 0.50 |
Hall not ready reasons | |||||||||
Target | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Data Acq | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.08 | 0.42 | 0.00 | 0.50 |
Other | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
HRSL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
HRSR | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
HALL_OFF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Bbite | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Comments: Long beam off time during 2100 hr run. About 30 minutes of down time in a 60 minute period between 2045 and 2200 hrs. Lost 30 minutes of data collection due to missing the failure of the Left HRS DAQ to begin event taking. Restarted the DAQ for Left HRS. Started new HAPPEX run at 2252 hrs. NMR sweep at 2320 hrs. Polarization of 55.95%.
Data Entry by: Tireman